21 years dedicated to physical therapy equipment.

How long it will take for product processing?
2019-11-05
It will take longer period to manufacture tens ems unit you need compared to the regular one. Before producing, we need to make sure the smooth communication including detailed product flow, so that makes it more efficient. After signing the contract, we need to confirm the material, design and sample with customers, then we can conduct the bulk production.

Doing well in R&D and production of tens units, Shenzhen 2018 GShenzhen L-Domas Technology Ltd. Technology Ltd. has gained a high reputation at home and oversea market. L-Domas produces a number of different product series, including tens units. The product is durable and functions very well during its long service life. It is very small and portable for being taken outside. As one of the live load elements, this product is a necessity and rather the most crucial part of designing an interior space. The product is suitable for people from all walks of life.

We are striving for a better world. By prioritizing initiatives such as employee volunteering, non-profit partnerships, and charitable giving, we strive to improve lives.
Custom message

Chat Online 编辑模式下无法使用
Chat Online inputting...